Dec 20: A project for comprehensive development of National Waterways-2 (River Brahmaputra) at the cost of Rs. 474 cr has been taken up by Inland Waterways Authority of India (IWAI), an autonomous organization under the Ministry of Ports, Shipping & Waterways for implementation during 2020-21 to 2024-25. Details of activities are in Annexure 1. Besides, the Ministry of Ports, Shipping & Waterways has a Central Sector Scheme (CSS) under which a 100 % grant is provided to the North Eastern States for the development of Inland Water Transport. Details of ongoing projects under CSS in the State of Assam are in Annexure 2.

A comparative statement of yearly expenditure details on the development of waterways in Assam for periods of 5 years from 2009-10 to 2013-14 under the previous Government and from 2014-15 to 2018-19 under the present Government is detailed in Annexure-3.

In addition to 891 km of NW-2 (the Brahmaputra) in 2014, 19 more Waterways were declared as National Waterways (NWs) in NER through National Waterways Act, of 2016. Out of which 121 km of NW-16 (the Barak) has been taken up for development. Further, projects for the development of Dhansiri river (NW-31) and  Kopili river (NW-57) have been approved.

Annexure -1

Ongoing Projects on Brahmaputra River (NW-2) in Assam as on 30th November 2022:

Sl.No.Name of ProjectDescription of activities
1Comprehensive Development of NW-2 at a cost of Rs. 474 crores
.
The project for the development of NW-2 includes the following main activities:-
1. Construction of the Jogighopa terminal,
2. Construction of cargo cum passenger terminal at Bogibeel,
3. DibrugarhFairway development
4. O&M of navigational aids
5. O&M of fixed & floating terminals
6. O&M of vessels
7. Consultancy/training maintenance of e-portal etc. 

Annexure-2

S.No.Name of Project/DescriptionCost of Project (Rs. in Crore)
 Construction of 25 nos. of 17.0 M long Floating Terminals for 25 Ghat Banks on the river Brahmaputra under the Central Sector Scheme10.97
 Construction of 15 nos. of 17.0 M long Floating Terminals for 15 Ghat Points on the river Barak (NW-16) under the Central Sector Scheme.6.37
 Construction of 16 nos.  of 25.0 M long Floating Terminals for 16 Ghat Banks on the river Brahmaputra under the Central Sector Scheme13.70

Annexure -3

Comparative statement of expenditure details on the development of waterways in Assam

Tenure of Previous Government from 2009-2014Tenure of Present Government from 2014-2019
YearExpenditure (Rs. in crore)YearExpenditure  (Rs. in crore)
2009-1052.112014-1537.33
2010-1140.332015-1679.39
2011-1256.472016-1774.67
2012-1356.912017-18118.97
2013-1448.642018-19109.61
Disclaimer: We donot claim that the images used as part of the news published are always owned by us. From time to time, we use images sourced as part of news or any related images or representations. Kindly take a look at our image usage policy on how we select the image that are used as part of the news.